Receptionist
dictating machines, typewriter, tape recorder, diagrams, entry books, file cabinets, pens, and pencils. WORKING CONDITIONS AND ENV...
Sumner, WA
04.21.12
General Clerk II - Full Time Federal Way
for monitoring, sorting, arranging and maintaining records in file cabinets and filing folders in accordance to either an approved...
Federal Way, WA
05.02.12
Staff Analyst 23
Process (EGSP), Develop Program Excellence (DPE), Functional Excellence Cabinet (FE/CAB)]; create PD executive presentations and p...
Everett, WA
05.13.12
Conservation Director
work day.Ability to occasionally move about inside the office to access file cabinets, office equipment, etc.Ability to constantly...
Everett, WA
05.02.12
Staff Analyst
Supplies: Place weekly and ad-hoc orders through SSPN while maintaining supply cabinet kanban system of inventory. * Mail Distribu...
Auburn, WA
05.16.12
Data Center Operations Engineer
installation of cabinets, cages, cables, shelving... on projects involving the physical installation of cabinets, cages, cables, s...
Seattle, WA
05.11.12
General Clerical/Filing
system. Must be physically able to move and work in standard 5 drawer filing cabinets. Candidate will also be responsible for gene...
Bothell, WA
05.19.12
Carpenter Maintenance A
for plant facilities such as the manufacturing and repair of fine finished cabinets and furniture for executive offices and equipm...
CS Tech I-Per Diem SEIU
sterilizer, ETO sterilizers/aerators, Washer/disinfectors, Pasteurizer/drying cabinet, and Cart washer. Must be cooperative and be...
Kirkland, WA
05.06.12
Cleaning Specialist
sinks, mirrors, windows, doors, stairs, diaper changers, cabinet fronts and interior of cabinets, high walls, columns, etc.- Maint...
Bellevue, WA
05.07.12
Accounting Clerk III Federal Way
4.5 Responsible for sorting, arranging, monitoring and maintaining records in file cabinets and/or filing folders in accordance wi...
Federal Way, WA
05.02.12
Control Systems Lead Designer
plans, installation details, wiring diagrams, loop diagrams, conduit/cable routing, cabinet/panel designs, power/grounding design,...
US
04.27.12
P/T Finisher I 2nd Shift
e., satin, remove burrs, break edges. · Perform sand blasting using a blast cabinet to put a finish on parts and become proficien...